ASTM D4021 PDF

Buy ASTM D SPECIFICATION FOR GLASS-FIBER-REINFORCED POLYESTER UNDERGROUND PETROLEUM STORAGE TANKS from SAI. ASTM D Standard Specification for Glass-Fiber-Reinforced Polyester Underground Petroleum Storage Tanks CONTAINED IN VOL: – Find the most up-to-date version of ASTM D at Engineering

Author: Yokinos Gozragore
Country: Panama
Language: English (Spanish)
Genre: Sex
Published (Last): 6 December 2013
Pages: 144
PDF File Size: 4.53 Mb
ePub File Size: 13.47 Mb
ISBN: 154-9-49278-566-3
Downloads: 22335
Price: Free* [*Free Regsitration Required]
Uploader: Moogugore

Provide full line size flexible connectors at each pump discharge connection [, at connections to the fuel oil tank vault] and fuel oil return.

Pipe shall be tapered, threaded and bonded as required at joint and fittings. Ball valves 2″ and smaller satm be threaded body bronze or brass valves of a full port design. Maximum tank test pressure 5 psi. Math June 1, NR Fuel Tender Inspection.

SECTION 22 50 00 FUEL OIL PIPING SYSTEM PART 1 – GENERAL

Stockham Valve and Fittings. These controls are experimental and have not yet been optimized for user experience. Install pumps where shown, in accordance with manufacturer’s written instructions, and recognized industry practices, to ensure that pumps comply with requirements and serve intended purposes.

Some states have incorporated these industry standards into their UST statutes and regulations.

Technical standards | All-Standards

All materials, installation and workmanship shall comply with the applicable requirements and standards addressed within the following references: Training All owners and operators of new UST systems must ensure that one or more asrm the following methods of atsm, testing, or inspection is used to demonstrate compliance with federal UST installation requirements by providing a certification of compliance on the UST notification form.

Results may vary based on the legibility of text within the document. Provide an electronic monitoring system to monitor the fuel oil level in e4021 fuel oil storage tank, monitor the tank for leakage and detect the presence and amount of water in the tank with the fuel. Pipe, Valves, and Fittings: To prevent water hammer or over pressurization, do not use quick closing valves and booster pumps without suitable controls.

  DT SWISS HVR 200 PDF

Every key 40 CFR topic is at your fingertips. Secondary containment piping shall be pneumatically tested at 25 psi. The wstm has been inspected and certified by a registered professional engineer with education and experience in UST system installation. This report is part of the collection entitled: Compression molded using epoxy molding compound and bearing the same UL label as pipe for fiberglass and as specified for piping above grade for steel.

State d0421 compliance is probably your biggest job challenge—the regulations and laws are so complex and they change so fast! Pumps shall be interlocked to automatically shutdown when a low level is sensed in the main storage tank via a dry contact closure in the fuel level monitoring system.

More About Petroleum USTs

Refer asstm Section 23 05 93 for additional testing requirements. At the Contractor’s option, all underground piping may be installed in a single secondary containment. Pipe shall be clean and free of sand and grease at connection ends.

For asym volume license the PDF is licensed to the person in which it is assigned. Repairs to piping shall be made with new materials. Tanks shall be isolated from lines during testing. Install secondary containment system after piping has been successfully tested. All reference amendments adopted prior to the effective date of this Contract shall be applicable to this Project.

SECTION 22 50 00 FUEL OIL PIPING SYSTEM PART 1 – GENERAL

The installer has been certified or licensed by the implementing agency. The owner and operator have complied with another method for ensuring compliance with the installation requirements of the rule that is determined by the implementing agency to be no less asfm of human health and the environment.

  GEOGRAFIA FIZYCZNA POLSKI KONDRACKI PDF

Thread with cleancut taper threads of length to engage all threads in fittings and leave no full-cut threads exposed after make up.

Minimum lengths shall conform to the following: Cash “B” Series or approved equal pressure regulating valves. The monitoring system shall be capable of detecting leakage rates as small as 0.

Sleeve piping penetrations through concrete construction. View a full description of this report. Provide Neenah or approved equal H 20 rated [gasketed,] steel traffic cover manholes, minimum 24″ diameter. Before secondary containment fittings are installed and pipe trenches are back filled and with tank vent open, all supply, return, vent and monitor piping shall be pneumatically tested at psi.

Ream steel pipe after cutting and before threading or socket welding. Documents Flashcards Grammar checker. All connectors shall be suitable for use at the pressure and temperature encountered at point of operation.

Shop Drawing submittals shall include, but not be limited to, the following: Pipe shall bear UL label for petroleum products’ piping.

Get Your Free Trial. Fuel Oil Piping Above Ground: Pumps, casings, connections, and mechanical seals shall be rated for operation at the system working pressure. Use on a local area network or other network is not permitted.

This option is mobile friendly asgm compatible with all devices, including mobile tablets and smart phones. Methods of sampling, inspecting, and testing shall conform to specified standards and codes.